65 years of experience in cement production

The history of the Semey Cement Plant began more than 65 years ago, with the commissioning of the first production line in November 1958. Two more lines were launched in February — April 1959. On October 4, 1965, the fourth rotary kiln was put into operation.

Today, the plant is equipped with state-of-the-art technology that ensures a high degree of environmental protection.

Its design capacity is 1,150,000 tons of cement per year. From 1958 to January 2023, the plant produced a total of 61,285,932 tons of cement.

The plant is located on the left bank of the Irtysh River, in the western part of Semey city, 3.5 km from the Zhana — Semey railway station.

The enterprise maintains a well-developed social infrastructure: A kindergarten for employees’ children with 150 places, a health center, a gym A factory canteen providing free meals for employees, operating 24/7. The workforce numbers 1,200 employees.

Semey Cement Plant products are supplied to the domestic market, as well as to the West Siberian Federal District of the Russian Federation. Our cement is highly valued by consumers in Almaty, Astana, and other regions of Kazakhstan. It has been used in the construction of:

  • Baikonur Cosmodrome;
  • Astana-Baiterek Monument;
  • Astana EXPO 2017 Exhibition Complex;
  • Medeu high-altitude skating rink and the mudflow protection dam in Almaty;
  • Buildings of corporations Vek, Basis A, the Sairan residential complex, new high-rise hotels, and entertainment centers;
  • Ice arena of the Almaty Sports Palace, requiring strict frost resistance and water impermeability standards;
  • Palace of Peace and Reconciliation in Astana;
  • Astana Sports Palace;
  • Caspian Sports Complex;
  • New Congress Hall in Astana;
  • Highvill Residential Complex;
  • Mosque and Business Center in Atyrau;
  • Suspension bridge over the Irtysh River in Semey, highly praised by Japanese and Turkish specialists for the quality of our cement;
  • Western Europe – Western China International Highway Corridor;
  • Astana – Borovoe national highway;
  • Reconstruction of the Astana – Pavlodar – Kalbatau – Ust-Kamenogorsk national highway corridor;
  • Nurly Tau multifunctional complex in Almaty;
  • Kazakhstan Hotel, built in the late 1970s;

Well-established production technology, the expertise of leading industry specialists, highly qualified staff, and an effective quality control system allow us to produce a wide range of high-quality cement, fully compliant with GOST and international standards. The plant’s testing laboratory holds state accreditation for technical competence.

We conduct quality control at every production stage:

– Incoming inspection of raw materials (limestone, clay, gypsum, sand, blast furnace slag, pyrite cinders, coal, etc.);

– Process control (from raw material processing to finished product output);

– Final product control (physical and mechanical, as well as chemical indicators);

All types of cement produced by the plant demonstrate stable quality, high efficiency under steaming, rapid early strength development, which ensures a significant reduction in construction cycles and savings in financial and energy resources.

The plant’s convenient location enables cement delivery to any region of Kazakhstan and the CIS by rail and road transport.

Deliveries are made in: Bulk in cement rail wagons; 1-ton “BigBag” flexible containers; Branded 50 kg packaging.

The plant’s Quality Management System complies with the international standard ST RK ISO 9001-2016 (ISO 9001:2015).

High-Quality Cement, Proven by Time!